Title |
Description |
Context |
Over optimism and inadequate consideration of the possible subsurface scenarios results in poor quantification of the subsurface uncertainty leading to a narrow and inaccurate range of in place and recoverable volumes. This skews Shell’s value analysis, resulting in poor decision quality and ultimately loss of value. |
Activity |
Describe the range of geological subsurface scenarios with appropriately wide input ranges such that volume estimates include a realistic low side technical assessment. Include relevant analogue and benchmark data. Describe the prospect / lead subsurface risks (chance factors) appropriately and dispassionately to remove optimism / recency bias. Describe the Low, Mid, & High commercial volumetric cases as discrete subsurface realizations. Update ranked lead / prospect portfolio as leads are matured |
Purpose |
To ensure multiple possible subsurface geological scenarios / realizations and their volume outcomes are considered. |
Requirements from other Standards |
None |
Evidence recorded in |
Integrated Sub Surface Description |
Accountability for meeting Control Intent |
Subsurface Project Lead |
Phase |
IDENTIFY |